
Half a century of expertise. Three generations of family craftsmanship.
Founded in Ankara in 1972, Çetin İnşaat has delivered every project on its three principles: on time, on budget, on quality. Today, run by the third generation of the Çetin family, the firm builds residential, commercial and land-for-flats projects across Ankara.
Half a century of imprint, three generations of discipline.
Our values come before our projects.
Engineering Discipline
Reinforced-concrete frames built to the seismic code, every stage logged under independent building inspection.
Three Generations
A family craft sustained in Ankara since 1972 — buildings families still call home today.
Built to Last
Insulated façades, quality material selection, details made for the long term.
Transparent Process
A clear price and schedule, regular progress updates, one team from start to finish.
The family behind
the signature.
The core team spanning three generations — from founding to partnership, from engineering to sales and marketing.
- HÇ/ 01 — Leadership53yrsHonorary Chairman (in memoriam)
Hüsnü Çetin
/ 02 — Leadership40yrsPhysics Engineer · Co-FounderYılmaz Çetin
/ 03 — Leadership40yrsGeophysics Engineer · Co-FounderYıldırım Çetin
/ 04 — Leadership8yrsComputer Engineer · Commercial DirectorBurak Çetin
/ 05 — Leadership12yrsCivil Engineer · Technical CoordinatorHüsnü Çetin
One city,
three generations.
- / 01PursaklarToday’s centre5projects
- / 02KeçiörenFirst large estates3projects
- / 03DikmenHousing1projects
- / 04BeytepeVilla1projects
The standards we build to and the material brands we work with.
Standards We Build To
- TBDY 2018Designed to the Seismic CodeTürkiye Building Seismic Code
- Yapı DenetimIndependent Building InspectionStatutory inspection regime
- TS 825Thermal Insulation StandardTurkish Standards
- İSGOccupational Health & SafetyOur site-safety practice
Brands We Work With

Let’s build more than a structure:a legacy.
Whether you have a concept-stage idea, a plot of land, or a project mid-flight — our team will return a feasibility briefing within 48 hours.